KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  10-31-2009
Number of Hours:  4.50
Manual Reference:  10-6
Brief Description:  Gear leg upper intersection fairing preparations

My brother Bernie dropped by so we worked on the gear leg upper intersection fairings. First we fit the nose gear leg upper intersection fairing and drilled it to the engine lower cowling. Next we fit the left gear leg upper intersection fairing. Then we riveted the nut plates for retaining the left and right main gear leg upper intersection fairings. Lastly we fit the canopy on once more as I had received the tow bar I had ordered and parked the aircraft nose first into the garage where the canopy open position would not hit the garage door opener rail as it did with the aircraft parked tail first in the garage.
' style=

Nose landing gear leg upper intersection fairing drilled to the bottom of the engine cowling

Nose landing gear leg upper intersection fairing drilled to the bottom of the engine cowling

' style=

Left gear leg upper intersection fairing drilled to the fuselage

Left gear leg upper intersection fairing drilled to the fuselage

' style=

Canopy reinstalled

Canopy reinstalled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.